How to turn supplier proposals into an evidence-linked comparison

Start from your requirements, not the vendors' structure. Each cell in the comparison should hold a quote from the proposal or an explicit 'not stated'. Silence is a finding.

For procurement teams and buyers. Written by the Encevra engine team. Reviewed 2026-10-12.

Requirements first

List each requirement as a row: uptime, data residency, restore time, total cost over the term. Columns are vendors. A comparison built from each vendor's headings will hide what they left out.

Quote or 'not stated'

Every cell is either a quoted passage or 'not stated'. A missing restore time is as important as a weak one. Conflicting figures, such as a stated three year total that ignores an annual increase, should be flagged for a person to recompute.

Where automation stops

Exact totals should be computed in a spreadsheet or calculator you trust. The current engines restate figures from the material and flag inconsistencies; they do not run verified arithmetic.

A worked comparison layout

One row per requirement, one column per vendor, and one cell per quote or 'not stated'. Add a final column for the reviewer's note so disagreements are recorded next to the evidence.

  • Requirement: restore time after an outage
  • Vendor A: quoted passage with its location
  • Vendor B: not stated
  • Reviewer note: ask Vendor B for a written commitment

Frequently asked questions

Can the engine total the costs for me?
Not reliably. It restates figures and flags inconsistencies; compute totals in a tool you trust.
What if two proposals use different terms?
Map both to your requirement wording, and keep the original quote so the mapping can be checked.
Which engine fits this?
The Procurement engine, or a custom engine configured in Studio from your requirement list.